3,895
 

2020 C8 Chevrolet Corvette Delayed Over Worker Strike: Report


ADVERTISEMENT
 


section  x1   |  0 bx goons and 1 bystanders Share this on Twitter       Share this on Facebook
 

section rides
  
 2 weeks ago '08        #1
276 page views
2 comments


GoldBluded  topics gone triple plat - Number 1 spot x1
space
avatar space
space
$24,073   Props total: 45807 45807
2020 C8 Chevrolet Corvette Delayed Over Worker Strike: Report
 

 
image


The new mid-engine 2020 C8 Chevrolet Corvette is almost already sold out completely, but everyone waiting on their car will have to wait a little bit longer due to the United Auto Workers strike reportedly delaying production.

It’s been three weeks since the UAW went on strike amid contract negotiations with General Motors, shutting down most of the automaker’s U.S. manufacturing operations. That includes the Bowling Green a*sembly plant that was finishing up production of the outgoing front-engine C7 Corvette before retooling to build the new mid-engine C8.


That’s where the trouble lies, as reported by The Detroit Free Press:

A spokesman for GM said, “As we’ve previously stated, Chevrolet Corvette Stingray production begins in late 2019 and convertible production follows in late first-quarter 2020. It’s too early to speculate on production timing impacts on any of our vehicles due to the UAW work stoppage.”

But a person familiar with operations at Bowling Green a*sembly said, “I know for a fact that this strike is directly going to affect the start of regular production for the midengine Corvette.”

That’s because the plant still must fulfill orders for the current model Corvette, dubbed the C7.

Then, the factory must undergo a tooling change to build the midengine car. GM had planned to idle the plant this week and next to retool it.

“That can’t happen because the plant hasn’t finished production of the current generation Corvette,” the person said.


This is a moderately bad look for the exciting new model after it was already allegedly delayed for various reported faults, including a switch to a new electrical architecture in the middle of development.


And now the car could likely be delayed yet again as GM attempts to take on the UAW. The union reportedly wants a guarantee from the automaker that future models will be built in American facilities, but GM is arguing costs are too high and it wants the flexibility to move some production overseas to keep costs down.

And now caught in the crossfire is the C7 and the C8 Corvette. Even if GM’s official line is that the C8 will go into production on schedule, it’s hard to imagine how when the plant is shut down and it seems union negotiations aren’t really getting anywhere.

visit this link https://jalopnik.com/2020 .. ike-1838856991
+1   



best
worst
2 comments
 

 2 weeks ago '18        #2
LuxuriousGreen  8 heat pts8
space
avatar space
space
$1,488   Props total: 4680 4680
I see them all the time on mound.
+1   

 2 weeks ago '08        #3
ExNihilo  54 heat pts54
space
avatar space
space
$23,185   Props total: 34999 34999
 LuxuriousGreen said
I see them all the time on mound.
Saw 2 in Livonia in the last few days. A blue one and a silver one.



ADVERTISEMENT
Sign me up
 
 

yesterday...


most viewed right now
+86online now  43
Image(s) inside Oct 21 - Black Wallstreet Trending - 1921 Tulsa Massacre
151 comments
20 hours ago
@news
most viewed right now
+26online now  36
Video inside Oct 21 - Fox News Asks Wrong Random Guy A Question (video)
17 comments
20 hours ago
@news
most viewed right now
online now  25
Image(s) inside Official Halloween Dope costume Thread ! 👻👹😈&#..
46 comments
22 hours ago
@wild'ish
most viewed right now
+24online now  16
Image(s) inside DJ Envy Responds To Gucci Mane Saying He's "Definitely Gonna Slap Him ..
174 comments
20 hours ago
@hiphop
back to top
register register Follow BX @ Twitter search BX privacy